End date (P50)

From FactGrid
Revision as of 19:34, 27 December 2023 by Diana Fontão (talk | contribs) (‎Added [pt] aliases: data de fim, finalizado em, terminado em)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
the final point of a period (excluding that date: →])
  • Until
Language Label Description Also known as
English
End date
the final point of a period (excluding that date: →])
  • Until

Data type

Point in time

Statements

0 references
0 references
Utilizar en PhiloBiblon en todos los campos que terminan en ED, v.g., ANA*RELATED_BIOED (Spanish)
0 references
LIB*RELATED_INSED
0 references
LIB*NAME_ED
0 references
LIB*RELATED_GEOED
0 references
LIB*PERIOD_ED
0 references